English
  • CN
  • English
  • Español
  • Português
  • Русский
  • العربية
Our inclined construction elevator in Xiangshan Bridge,with height 270m
TIME:2022-11-30

The East Ring Expressway runs through the east of Zhongshan City, running north-south, and is an important node of the A-shaped traffic skeleton of the Pearl River Delta.
The Xiangshan Bridge is the top priority of this project.

The Xiangshan Bridge spans the Hengmen waterway, with a span of 880 meters and a tower height of 270 meters, which is as high as a 90-story building.
This is a double-layer bridge, which is relatively rare in China.
After the Xiangshan Bridge is completed, it will become a new landmark of Zhongshan.

Our inclined construction elevator participated in the construction of Xiangshan Bridge.

[video width="1080" height="1920" mp4="/cabrm/old/uploads/2022/11/Inclined-construction-elevator-in-Xiangshan-Bridgewith-height-270m-origin.mp4"][/video]

The Xiangshan Bridge is expected to be completed in 2024.

 

 

Produced By CMS 网站群内容管理系统 publishdate:2025-11-10 16:36:51